Sitetectonix Private Limited, Singapore.
March 2005 - Present
Landscape Technical Officer
Elton-Roade Architects, Singapore.
June 2004 to March 2005
Temp. Draughts person for a period of 8 months
Prepared tender/construction drawings and submissions to Authorities.
Assisted architects in design development/ presentation & detailing.
GoAvin Pte Ltd, Singapore.
K-Master Renovation, Singapore.
Sept 2003 to June 2004
Temp. Draughts person
Prepared construction drawings and submissions to Authorities.
Assisted architects in design development/ presentation & detailing.
Plan and coordinate Interior works.
CPG Consultant Pte Ltd, Singapore.
September 1999 to September 2003
Architectural Assistant
Prepared tender/construction drawings and submissions to Authorities.
Assisted architects in design development/ detailing and management of submissions to Authorities.
Projects involved include Raffles Junior College at Bishan.
Architect Team 3, Singapore
June 1991 to August 1999
Draughtman (Auto-CAD/ Draughting)
Prepared tender/construction drawings and submissions to Authorities.
Assisted architects in design development/ detailing and management of submissions to Authorities.
Projects involved include the following:
- Wacker Siltronic Wafer Fab Factory at Tampines.
- HNS Wafer Fab Factory at Tampines.
- Seagate Wafer Fab Factory at Gambas Avenue.
- Compact Metal Factory (Light Industrial).
- Compaq Asia Phase 2 Factory (Light Industrial).
- Singapore Network Service Office Building at South Buona Vista.
- The Synergy Office Building at Jurong East.
- AIA Building at Changi.
- Sewage Lift Station at Buona Vista Road.
- Sungei Buloh Nature Reserve.
|